How a BIM Manager edits 150 room data sheets in less than 15 minutes

"I was able to make the change and reprint all the PDFs again in 10 minutes."
Patrick Florent
"I was able to make the change and reprint all the PDFs again in 10 minutes."
Patrick Florent
"I was able to make the change and reprint all the PDFs again in 10 minutes."
Patrick Florent
Hotel Interior
Hotel Interior
Hotel Interior

Key Results

architect icon
architect icon
Countless days saved copy & pasting data between system
bim manager
bim manager
15x Faster making small changes to a set of data sheets
project manager icon
project manager icon
0 additional cost to add other apps and test new workflows!

How to Edit 150 Room Data Sheets in Less Than 10 Minutes

Architecture49 is a Canadian integrated design and delivery firm. They’ve built some of Canada’s most important buildings and environments. Most of their projects focus on one of six key disciplines: Healthcare, Hospitality, Science and Technology, Security and Defence, Sports and Entertainment, and Transportation. That means that most of their work is highly specialized and complex. These projects require extensive documentation that must always be tailored exactly to client specifications.

The Challenge: Room Data Sheets Are a Time-Consuming Deliverable

Room Data Sheets are just another line item written into the deliverable requirements of a contract. However, they’re an important deliverable. They enable costing, serve as a final QA check for those without access to Revit, and are an easy way for clients to understand what is in, or will go into, each and every room.

Most firms have an established process.

That process typically relies on a combination of:

  • Spreadsheets

  • Scripts

  • Maybe some Dynamo thrown in

  • Lots of import/export functions

  • And inevitably, copy and pasting between systems

Architecture49’s process relied on a combination of PowerQuery and complex spreadsheets to automate as much of the process as possible. This workflow hit a bottleneck during several projects where the raw data was provided in inconsistent formats. Specifically, row and column structure differences between source documents meant an automated approach would be impossible. In such cases, the BIM team always delivered, but it meant many hours of manual data entry.

Other Key Challenges to the Spreadsheet & PowerQuery Approach to Room Data Sheets

Room Data Sheets are often considered inconsequential to your clients until… they’re not.

“So if you've done all your room data sheets and someone asks you to change the layout... it's not a great process to have to go do.”
Patrick Florent, Architectural Technologist, A'49

Making last-minute changes to a set of documents that were manually prepared could take hours.

The Solution: A Change in Workflow

Layer room data sheets

Project workload dictated a change in workflow ASAP. Layer’s flexible license structure and template-based deployment approach allowed an initial group of users to get started quickly and with very little training.

Within a quarter, the Design Through Technology & Innovation Team was able to see key results:

"Just doing that change and refreshing took me hours. Like at least five hours to do in a day. It was just a struggle. I tried to do a similar change with that for Layer. I was able to make the change and reprint all the PDFs again in 10 minutes."
Patrick Florent, Architectural Technologist, A'49

Layer licenses allow unlimited collaborators, which helps keep their costs low. In addition, they’re able to create an unlimited number of projects. This lets the team try out new ideas quickly by leveraging Layer Templates.

Read More

Architecture49 Case Study
Architecture49 Case Study
Architecture49 Case Study
Architecture 49 logo
Architecture 49 logo
Architecture 49 logo

About Architecture49

Architecture49 is a national leader in the integrated design and delivery of some of Canada’s most important buildings and environments. They focus on six key areas of expertise: Healthcare, Hospitality, Science and Technology, Security and Defence, Sports and Entertainment, and Transportation. Their national sectors complement an ongoing base of regional and community work.