Features
Solutions
Workflows
Resources
Pricing
Login
Book a Demo
Director Customer Experience at Layer
5
-
min read
Gathering information at the beginning of a project usually means lots of back and forth via email, spreadsheets, and documents.Here are 4 simple ways to improve the Pre-Design phase to save you hours of time down the road in SD, DD, CD, and even in to CA.
The best way to select the RIGHT CMMS for your business begins with a detailed needs assessment of your organization's processes and tools.
Revit is the leading BIM Software for architectural designers. More than 80% of design professionals use Revit for the Design process
When a building has met the end of its useful life, an owner has a decision to make. Should the building be demolished, or reused? This guide will help you prepare for that conversation with your client.
OS&E or Operating Supplies and Equipment are consumable goods that support daily operations. They include important items like kitchen utensils, cleaning supplies, and bed linen.
In construction, the unexpected is common, but never welcome. The root cause is often poor communication. Project Controls processes are put in place to facilitate better communication between GCs, Owners, Architects and other stakeholders.
Learn about Adaptive Reuse and the basic concepts and requirements for updating an existing building or structure to meet new requirements
Equipment surveys are essential to building owners and AEC professionals to track assets, ensure accurate planning, and support efficient planning, design, and construction coordination.
A furniture schedule is a detailed document listing types, dimensions, materials, and finishes of furniture for a project. At its core, a furniture schedule is a detailed list that encompasses all pieces of furniture required in a project.
The key to saving time across a project is to capture data accurately the first time. Here are 4 tips during pre-design to get a few hours back throughout your project.
Architectural Room Data Sheets, commonly referred to as "room data sheets" are information sheets detailing attributes of a room's interior elements. They are documents that capture and summarize data about wall and floor finishes, ceilings, lighting, furniture, MEP systems, fixtures, graphics, and more.
The goal of the Construction Documents phase is to accurately and completely document all aspects of the design. The drawings produced during this phase are used to bid, permit and, ultimately, construct the project.
Load More
Layer is a flexible data & workflow platform for buildings
Made with ♡ in Nebraska
Product
Demo
Updates
Download
Architects
Engineers
Designers
Design Tech
Construction
Facilities
Help Center
Case Studies
Demo Videos
Blog
Support
Video Guides
API Docs
Events
Legal
Privacy
Terms
Security
Contact